Amazon
Linked to 17 data-center sites in Texas public records.
#2 of 32 organizations
What this means
How many distinct data-center sites in our Texas public records are linked to this organization.
Limits: Counts only sites we could find in these records and link to the organization. Projects filed under code names, or whose ownership we could not resolve, are not included.
Unit: sites · As of Sep 26, 2026
TDLR(opens in a new tab)Texas Comptroller(opens in a new tab)
Reported for 5 of 17 sites
What this means
The builder's estimated construction cost, added up across the site's TDLR registrations.
Limits: An estimate filed before construction, not an audited amount. Many sites have no TDLR registration, so it's shown as unavailable, not zero. Registrations can overlap, for example a renovation of an already registered building.
Unit: US dollars · Registrations filed to date
Estimated for 5 of 17 sites
What this means
A rough size estimate. It's the registered construction cost divided by an average all-in cost of building one megawatt of data-center capacity.
Limits: Not a measured or requested load. The real power draw can be much higher or lower. Available only where a construction cost is registered.
Unit: megawatts (MW) · As of Sep 26, 2026
8 sites without a published location
What this means
How many different Texas counties the organization's recorded sites are in.
Limits: Sites without a published location can't be placed in a county, so the true number may be higher.
Unit: counties · As of Sep 26, 2026
Advanced dashboard
Amazon on the map
Why this might matter to you
These are the counties where records place Amazon's facilities. Pick one to see every recorded site nearby.
- Dallas County · 3
- Bexar County · 2
- Floyd County · 1
- Pecos County · 1
- Wharton County · 1
- Winkler County · 1
These records don't measure effects on bills, water or reliability.
Where this comes from
- TDLROriginal source
More detail
Explore the records
| Project Eagle (Boling) | Boling, Wharton Co. | Likely | $1.2B | 68 | Jun 25, 2026 |
|---|---|---|---|---|---|
| Pecos County Data Center (Fort Stockton) | Fort Stockton, Pecos Co. | Likely | $900M | 51 | Aug 4, 2026 |
| Confidential Data Center (Floydada) | Floydada, Floyd Co. | Low evidence | $300M | 17 | Jul 20, 2026 |
| NTT Global Data Centers Americas - Dallas TX2 | Garland, Dallas Co. | Likely | $135M | 8 | Oct 17, 2022 |
| NTT Global Data Centers Americas - Dallas TX3 | Garland, Dallas Co. | Likely | $135M | 8 | Oct 1, 2022 |
| ALE60 Data Center | San Antonio, Bexar Co. | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jan 1, 2021 |
| ALE61 Data Center | San Antonio, Bexar Co. | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jan 1, 2021 |
| ALE62 Data Center | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jan 1, 2021 |
| Bexar 1 | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jul 24, 2026 |
| C1 Bosque II LLC | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Apr 13, 2026 |
| Cipher Black Pearl LLC Data Center | Wink, Winkler Co. | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Feb 15, 2024 |
| Flamingo | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Aug 10, 2026 |
| Gulf Horizon Data Center | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | May 4, 2026 |
| NTT Global Data Centers Americas - Dallas TX4 | Garland, Dallas Co. | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Apr 18, 2024 |
| Pecos Ranch Data Center | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Aug 10, 2026 |
| Spectrum Data Center | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | May 21, 2026 |
| Stingray | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jun 26, 2026 |