Anthropic
Linked to 3 data-center sites in Texas public records, all registered for state data-center tax exemptions.
#7 of 32 organizations
What this means
How many distinct data-center sites in our Texas public records are linked to this organization.
Limits: Counts only sites we could find in these records and link to the organization. Projects filed under code names, or whose ownership we could not resolve, are not included.
Unit: sites · As of Sep 26, 2026
No site reports a cost
What this means
The builder's estimated construction cost, added up across the site's TDLR registrations.
Limits: An estimate filed before construction, not an audited amount. Many sites have no TDLR registration, so it's shown as unavailable, not zero. Registrations can overlap, for example a renovation of an already registered building.
Unit: US dollars · Registrations filed to date
Needs a construction cost
What this means
A rough size estimate. It's the registered construction cost divided by an average all-in cost of building one megawatt of data-center capacity.
Limits: Not a measured or requested load. The real power draw can be much higher or lower. Available only where a construction cost is registered.
Unit: megawatts (MW) · As of Sep 26, 2026
2 sites without a published location
What this means
How many different Texas counties the organization's recorded sites are in.
Limits: Sites without a published location can't be placed in a county, so the true number may be higher.
Unit: counties · As of Sep 26, 2026
Advanced dashboard
Anthropic on the map
Why this might matter to you
These are the counties where records place Anthropic's facilities. Pick one to see every recorded site nearby.
These records don't measure effects on bills, water or reliability.
Where this comes from
- Texas ComptrollerOriginal source(opens in a new tab)
- First record: Nexus Data Centers, Jul 21, 2025
More detail
Explore the records
| Cipher Barber Lake LLC Data Center | Colorado City, Mitchell Co. | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Nov 7, 2025 |
|---|---|---|---|---|---|
| Fluidstack Abernathy Data Center | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jan 20, 2026 |
| Nexus Data Centers | Unavailable: No location published in these records | Low evidence | Unavailable: No TDLR construction registration with a cost | Unavailable: Needs a registered construction cost | Jul 21, 2025 |
Show this trend as a table
| Week of | Sites with records | Estimated MW |
|---|---|---|
| Jul 21, 2025 | 1 | Unavailable |
| Nov 10, 2025 | 2 | Unavailable |
| Jan 26, 2026 | 3 | Unavailable |