Thelma Data Center
Haskell, Haskell County
Thelma Data Center is a data-center site in Haskell, Haskell County. Records link it to Google through the registered entity Homebound Group LLC. It entered the Texas Comptroller's Qualifying Large Data Center Project program on Aug 11, 2026, a Texas program giving sales-tax exemptions to large data-center projects. TDLR lists 2 construction registrations with estimated costs totaling $700M.
Key numbers
2 TDLR registrations
What this means
The builder's estimated construction cost, added up across the site's TDLR registrations.
Limits: An estimate filed before construction, not an audited amount. Many sites have no TDLR registration, so it's shown as unavailable, not zero. Registrations can overlap, for example a renovation of an already registered building.
Unit: US dollars · Registrations filed to date
630,000 square feet
What this means
Floor area published on the site's TDLR registrations, added up.
Limits: Published for only some registrations, and registrations can overlap.
Unit: square feet · Registrations filed to date
From construction cost, not measured
What this means
A rough size estimate. It's the registered construction cost divided by an average all-in cost of building one megawatt of data-center capacity.
Limits: Not a measured or requested load. The real power draw can be much higher or lower. Available only where a construction cost is registered.
Unit: megawatts (MW) · As of Sep 26, 2026
60 of 100 checklist points
What this means
How much public-record evidence supports that the project is real and advancing: registrations, certification, tenant named, permits, inspections.
Limits: A checklist score, not a probability that the site will be built or operate at any size.
Unit: 0–100% (uncalibrated) · Scored Sep 26, 2026
Why this might matter to you
Without a published location we can't say what's nearby. The records still document who is behind the site and what has been filed.
Registration in the Comptroller program means the state lists this site as eligible for a data-center sales-tax exemption. The registry doesn't publish the value of any exemption.
Where this information comes from
- Texas Comptroller, Data Centers in Texas registry1 record for this siteOriginal source(opens in a new tab)
- Texas Department of Licensing and Regulation, TABS project search4 records for this siteOriginal source(opens in a new tab)
- Records dated May 27, 2025 to Aug 11, 2026. Each record in the history below links to its original filing.
Location
- Address
- 10357 Loop Road
- How we know
- Location unavailable: no address or reviewed location is published for this site in our records.
Who is behind it
- Registered entity on the recordsHomebound Group LLC
- Linked organizationNamed on the Texas Comptroller registry recordSupporting record(opens in a new tab)
- Texas Comptroller registry entry Documented
- owner
- Homebound Group LLC
- occupant
- Google LLC
- operator
- Google LLC; Design, LLC
Evidence history
- Met: At least one TDLR building registration+20
- Met: Two or more TDLR building registrations+10
- Met: Total registered construction value of at least $500M+15
- Not met: A tenant is named in a TDLR record+20
- Met: Certified by the Texas Comptroller data-center program+15
- Not met: A TCEQ air permit has been filed
Other Google sites
- Alamo Data CenterMidlothian
- Austin Data Center 2 LLCPflugerville
- C1 Bosque ILocation unavailable
- C1 Fort Worth LLCLocation unavailable
- Cinco Data CenterLocation unavailable
- Hutto Data Center 3 LLCHutto
- Hutto Data Center 4 LLCLocation unavailable
- Hutto Data Center Campus LLCHutto
And 5 more on the organization profile.